Electrical Panel Upgrade in Fort Myers Beach, FL

100A to 200A • 400A services • Sub panels • Permitted & inspected • (239) 880-9473

What happens when an Ian-flooded electrical service has to be replaced?

We replaced the entire 400-amp service equipment at a commercial property on Fort Myers Beach after Hurricane Ian: every panel, circuit and disconnect had been submerged, and every piece had to go. We swapped it like for like for new Square D equipment and restored power. The service was an older three-phase, four-wire delta with a high leg, so the new gear had to match it.

The Town of Fort Myers Beach runs its own Building Services Division within Community Development, separate from Lee County. The Town applies the FEMA 50 percent rule in plan review, which can matter when electrical work is part of a larger repair or improvement.

Free Estimate in Fort Myers Beach (239) 880-9473
New Square D panelboards, disconnect and wireway in a commercial electrical room on Fort Myers Beach

Why replace like for like?

Many property owners on Fort Myers Beach, especially commercial owners, are still recovering because of the cost and the restrictions involved in replacing equipment. Like-for-like replacement is what let this property’s service come back. Read the full 400-amp service replacement for the before and after photos.

What about a regular house panel upgrade on the island?

The same careful approach applies at house scale: confirm the service size, the meter equipment and the grounding, pull the permit through the Town, and schedule the inspection through its private provider. If your mailing address says Fort Myers Beach but the parcel is unincorporated, Lee County permits the work instead, and we check which before applying.

How does permitting differ for a service replacement after a storm?

The paperwork is the same: a permit through the Town’s portal and inspections by its private provider. What differs is the scope. When repairs and improvements together approach half the building’s value, the Town applies the FEMA 50 percent rule in plan review, so we ask early how the electrical work fits into the overall permit.

New Square D panelboards, disconnect and wireway in a commercial electrical room on Fort Myers Beach

400-Amp Service Replaced After Hurricane Ian, Fort Myers Beach

Flood-damaged commercial service equipment replaced like for like with new Square D panels and disconnects.

See the full project

What is included in a panel upgrade in Fort Myers Beach

  • A walkthrough of the service, meter base and grounding
  • The permit, the new panel and breakers, labeled and tested
  • The final inspection and your permit paperwork

Every job is quoted after we see it. Call (239) 880-9473 or request a free estimate.

Electrical Panel Upgrade questions in Fort Myers Beach

Can you replace flood-damaged panels?
Yes. We replaced a commercial 400-amp service that had been completely submerged, with new Square D equipment, like for like.
What is the FEMA 50 percent rule?
It limits how much a building can be repaired or improved relative to its value without being brought up to current flood standards. The Town applies it in plan review; we flag it if your electrical project is part of a larger renovation.
Who permits the work on San Carlos Island?
Parts of San Carlos Island are unincorporated Lee County and are permitted by the Lee County Building Division rather than the Town.

More: Electrical Panel Upgrade · all services · electrician in Fort Myers Beach

Serving Fort Myers Beach

Electrical Panel Upgrade in Fort Myers Beach: free estimate

Get an estimate

Leave your name and phone. We will call you about this job.